Commercial and Industrial Projects – Q3 2021

A summary of some of the other commercial industrial projects completed, underway or beginning soon.

Greensport Marina – Ashville, AL
OEC installed a 10,000 gallon double wall tank, new fuel piping, a Gilbarco Legacy dispenser and a Fuelmaster pedestal for 24-hour credit card processing. The customer is extremely satisfied and had a very productive summer.

Lumpkin Development – Calera, AL
OEC installed a new Gasboy dispenser and a Fuelmaster Pedestal. The customer also chose to go with the cloud hosted FMLive fuel management software. In addition to the real time fueling statistics, the customer is also taking advantage of the Fuelmaster AIM (automated information module) technology on their fleet. They are on the cutting edge of fuel dispensing and fuel management.

Birmingham Jefferson County Transit Authority (MAX Transit) – Birmingham, AL
In conjunction with Syntech (parent company of Fuelmaster), we are completely overhauling their fuel management system. We are installing four Fuelmaster pedestals at each of their fueling stations. Every vehicle in their fleet will be equipped with AIM (automated information module) for real time diagnostic reporting each time they fuel. The customer will also take advantage of the Fuelmaster’s FM Live cloud hosted software, allowing them to have real time fuel management from anywhere in the world. In addition to their fuel management we will partner with Lube Supplies to install the Graco Pulse system in their lube bays. This will give them transparency and accountability in their fluid management down to the ounce. We hope to have it installed later this year.

Autauga County Sheriff’s Department – Prattville, AL
OEC will be installing a Fuelmaster pedestal and installing Fuelmaster software. We are hoping to have them up and running by the end of November.