Commercial and Industrial Projects – Q4 2021

A summary of some of the other commercial industrial projects completed, underway or beginning soon.

Duncan Bridge Marina – Arley, AL
We installed three new Gilbarco Legacy pumps and a Fuelmaster Pedestal providing them with 24 hour fueling capability, which is a rarity on Smith Lake. The customer also purchased and installed new OPW Flexworks fuel piping from their tank to their walkway. This spring as they replace their walkway they plan to replace the remainder of their pipe with the same product. This will give Duncan Bridge Marina the most up to date fueling system on Smith Lake.

Autauga County Sheriff’s Department – Prattville, AL
We installed a Fuelmaster pedestal and connected it to their dispenser. They tell us they are extremely pleased with what they have thus far and are excited to have the software installed very soon.

JP Coleman State Park – Iuka, MS
We replaced the majority of their fuel lines with Bravo fuel lines. We also installed a new Gasboy retail dispenser. Pending government approval we hope to be installing a Fuelmaster pedestal very soon.

Tuscaloosa County Schools – Tuscaloosa, AL
This will be one of our largest commercial and industrial jobs we have done in several years. At four different school sites across the county we are upgrading their fueling equipment. At each site we are installing a new above-ground double wall Hall tank (varying between four and six thousand gallons each), Red Jacket submersible turbine pumps, Centeron tank monitors and Gasboy dispensers. Each pedestal will also receive Fuelmaster upgrades. The tanks are expected to be finished by the end of March and the project is projected to be completed by the end of April.

J&M Tank Lines – Sylacauga, AL
At the Sylacauga location of J&M, we are installing a new Fuelmaster pedestal and software along with a new Gasboy dispenser. Their existing setup is extremely unreliable and they are very excited to be moving to a more reliable setup.

Commercial projects – Q4 2021